XTC v102

2025-07-15

Load Testing

  • Since XTC 99, users can be notified by email when a load test finishes. The section for configuring recipient email addresses has been moved to the Settings tab. Additionally, the notification email has been refined. It now includes a direct link to the test report.
  • Resolved an issue where XTC could not stop a load test or download the results when using machines in Belgium alongside machines in Berlin or Turin.
  • Currently available XLT execution environments:

Monitoring

  • The list of scenario executions on the History page can be filtered by various criteria, such as time range, scenario, location, and status. Now, when viewing the details of a scenario execution and later returning to the list, the previously configured filter settings are retained.

Platform

  • Minor UI improvements.
Last modified July 14, 2025